Library in the Park

New CRPL design

When it opens in summer 2013, the new Cedar Rapids Public Library will join the former Carnegie Library, the Museum of Art, the Gazette building, and First Presbyterian Church in surrounding the city’s signature downtown Greene Square Park, the long ago former site of the original Washington High School. Designed by OPN Architects, the new library replaces the flood damaged library on First Street, which was just two years shy of its 25th anniversary when the flood hit. The library had been gearing up for a major renovation and expansion project just before the flood.

In January 2009, FEMA declared the library building hit the 50 percent threshold, which meant FEMA would help fund total replacement of the current building instead of repairing it. Typically in this case, a new building must be located on the same site, but sitting less than a block from the riverbank seemed foolish so the city was able to get a variance to build at a new site. Over the next year and a half the merits of a new library and its location were hotly debated, among many other projects the city was charged with.

Three final sites were seriously considered: the TrueNorth block just south of Greene Square on 4th Ave. SE, the Emerald Knights site (between 1st and 2nd avenues SE, and 7th and 8th streets), and a last minute pitch for the existing Gazette/KCRG block (between 2nd and 3rd avenues SE, and 5th and 6th streets). Despite the board’s Emerald Knights recommendation, the City Council ultimately voted on Feb. 24, 2010, to build on the TrueNorth site, in anticipation of a new synergy of culture and community between the new library, the park, and the existing art museum. However this is no new concept for Cedar Rapids.

By the late 1960s, the Cedar Rapids Public Library was in dire need of addition space, despite two previous additions to the old Carnegie Library, which opened in 1905. A survey conducted in 1966 cited population growth, increase in circulation, and accessibility for needing an expanded library. The report, produced by University of Iowa Library School Director Fred Wezeman, concluded that a new library should be located in the central business district, should maximize area on the first floor, and be convenient to main traffic arteries and close to public transit. He also suggested the addition of a new west side branch library; a Kenwood branch already existed on the eastside which remained in operation until the mid 1990s. [1]

Brown, Healey and Bock Architects-Engineers was hired in 1968, to begin design work on a new library, initially anticipated to be built next to the existing Carnegie Library on 3rd Avenue SE across from Greene Square where the current Museum of Art now sits. [2] A year earlier, though, an idea was floated to incorporate a new library into a larger civic center project, proposed as the grand centerpiece of Cedar Rapids’ urban renewal in the area of the current US Cellular Center. (I’m currently researching the implications of the federal urban renewal program in Cedar Rapids…stay tuned.) The civic center had its own setbacks that ultimately led to a scaled-back project that did not include the library.

In March 1969, the library board unveiled a unique proposal to construct a new subterranean library underneath Greene Square Park. This was not the board’s final recommendation, just an idea. At this point the board was still considering building next to the existing library and another site at 200 First Street SE, the present-day site of the Alliant Energy Tower.

Architect Ted Healey is quoted in the Gazette as promoting the cost savings to heat and cool the underground library, as well as the city’s plans to construct a new parking ramp adjacent to Greene Square, across the 4th Street tracks on the former site of Union Station, regrettably torn down in 1961. From the Gazette: “According to initial plans, the library would be fronted by a pedestrian walkway sunken about 10 feet below ground level. Huge glass windows would present a view into the library.” [3]

1969 Greene Square Park library proposal

The drawing is oriented with north at the bottom so the existing Carnegie Library would be across the street (3rd Ave) at the bottom. It is difficult to discern where on the site plan the underground facility actually was to be. The large, oddly-shaped white space in the center must be the sunken plaza, but I’m unsure if the underground building is to the lower left corner or upper right corner. My suspicion is that it is to the upper right (I think the darker shading along the sunken plaza may be the “huge glass windows”), but that presents some new questions. The fan-shaped building in the upper right corner was already built five years earlier in 1964, housing a senior center – ultimately the only new structure built in Greene Square and torn down in early 2011.

According to a May 22, 1969, Gazette brief, the library board had still not decided between the Greene Square or 200 First Street SE (Alliant) location. It seems an addition to the existing Carnegie was no longer being considered. Either way a new library, to cost $2.7 million to construction, was contingent upon the passing of a bond election. [4]

A June 29, 1969, Gazette editorial seems to suggest the Greene Square proposal was the library board’s chosen site to move forward with, in a response to the Cedar Rapids Garden Club’s petition against the subterranean library plan. The garden clubs objected due to the loss of trees required for construction. The editorial board counters this argument by claiming a mere dozen trees out of more than thirty would need to be removed and that surely new plantings and landscaping would preserve the park. “There may be other reasons why a partly underground central library in Greene square is not the best solution to the city’s need for a new one, but the loss of greenery and tree destruction aren’t among the drawbacks that should be decisive.” [5]

Needless to say the sunken library was never pursued much further. The bond failed during a special election later that year, and again in March and November of 1973. In all three elections, a majority of voters voted yes, but did not achieve the state mandated 60 percent supermajority to pass. [6] Beyond this there is a gap in my research regarding further funding and development of the library. (CRPL’s free online archive of the Gazette seems to be missing 1977 – 2008.)

Ultimately a new 85,000 square-foot central library was built at 500 First Street. The new library celebrated its grand opening on February 17, 1985, and was located there until the flood three years ago, June 11-13, 2008. Designed by the same architects originally hired in 1968, the new building seemed to satisfy certain parameters set out in the 1966 library study. It was located near the downtown core, had a majority of public spaces on the ground level, and was conveniently accessibly both by car and by transit (a new Ground Transportation Center opened just a few years earlier across the street). Seen below is the library under construction in 1984.

Cedar Rapids Public Library construction 1984

The parti of this new library was a basic rectangle, fit to the downtown street grid, overlaid by an organizational axis shifted 45 degrees. A two-story high atrium bisected the building, connecting an entrance at the parking lot facing First Street and an arguably more urban entrance directly off of 5th Avenue. In the smaller corner created to one side of the atrium was a public auditorium opposite of the library. A partial second floor bisected the rectangle in the other direction (perpendicular to the atrium axis), which housed the children’s section on the library side, and offices in the smaller portion above the auditorium. The north portion of the building was mostly monolithic, clad in large textured concrete panels, with the southern portion wrapped in floor to ceiling windows, sheltered by the deep overhang of the waffle form concrete ceiling.

Interestingly, the new library now under development follows a strikingly similar conceptual parti, though articulated quite differently. At the most basic level, the new library will be a two-story rectangle with an atrium space separating a larger open stacks area from a smaller area housing admin functions and an auditorium. The stacks area is wrapped in glass, while the back of house portion is less open, but certainly not the solid mass of concrete that the 1985 building was. Obviously the two library designs are quite different; architecturally they are night and day, but certainly parallels do exist.

When completed in summer 2013, the new library will open up towards Greene Square, reactivating the fading park and creating a cultural gathering space, bound by the historic Carnegie and newer art museum on the opposite side. Greene Square could once again be the grand civic park Cedar Rapids so needs and deserves. And perhaps the library was always meant to be a part of that.

Citations
1. Cedar Rapids Gazette, Survey Says Library Expansion Urgently Needed, Jan. 21, 1968
2. Cedar Rapids Gazette, Select Architect to Design New Public Library, Aug. 21, 1968
3. Cedar Rapids Gazette, Propose Library Under Greene Square, March, 26, 1969
4. Cedar Rapids Gazette, Still Undecided On Location for Central Library, May 22, 1969
5. Cedar Rapids Gazette, Trees Kept, June 29, 1969
6. Cedar Rapids Gazette, Same Old Story, Nov. 8, 1973

25 Year Old Library Time Capsule Opened Today

Cedar Rapids Public Library time capsule from 1985, opened June 29, 2010.

The time capsule at the now former Cedar Rapids Public Library was uncovered and opened this morning (Tuesday, June 29) after being buried since 1985, when the library building was built. Evidently it took several years of trying to pass a super-majority vote by citizens to fund the new library, which replaced the original Carnegie Library location at 3rd Avenue and 5th Street SE, now a part of the Cedar Rapids Museum of Art.

The capsule was buried about five feet down, under a triangular planter near the main entrance. The contents, which were all paper materials (brochures, books, newspapers, etc.), were put in a cardboard box, wrapped in a plastic garbage bag, and placed in a baby casket. The casket had begun deteriorating and clearly had filled with water during the flood. All the contents were damp with several areas of mold growth, but in surprisingly good shape for sitting wet for the past two years.

The materials were laid out to look through and view by those attending before being taken to be frozen to halt anymore mold growth until they can be sorted and restored. Contents included a White & Yellow Pages phone book (obviously much more used back in ’85), brochures and literature about most of the local non-profit organizations and cultural venues, some local post cards, and the most interesting documents – reports and plans for major civic projects underway at the time. There was a report on the new airport terminal – which opened up a year later in 1986 – with some fantastic concept renderings of the inside and the front. Unfortunately I could not open to see the inside due to its current condition.

About ten to fifteen people showed up for the time capsule opening, about half from the local news media. Ted [unsure of last name] who was the architect for the 1985 library building was there at the beginning. I was able to talk with him for a few minutes, which was very interesting. He told me about his former firm, Brown Healy Stone & Sauer, which later merged with Howard R Green Co in 2001, after he had already retired.

The opening of the time capsule was the last remnant of the library at this building and site. It functioned as a library for only 23 years from 1985 to 2008, and will now be transformed into an office facility for TrueNorth. While the development of a new central library across from Green Square Park is exciting and ultimately, probably the best decision for the Library’s future, the existing building will always be appreciated for its role as our central library for the past quarter-century. The reinvention of the building into something new, serving a different role, is similar to the story of the old Carnegie Library, which now houses the gift shop, activity rooms, and offices for the art museum. By keeping the building and reusing it, even with additions and aesthetic alterations, its contextual, cultural, and new historical value is preserved for future generations.

The photo above is from the Cedar Rapids Public Library’ Facebook album. See more time capsule photos here.

City Developments

It’s been a busy news week in Cedar Rapids regarded the city’s future and upcoming redevelopment.

New City Manager
On Tuesday night the City Council unanimously voted in favor of hiring current West Des Moines City Manager Jeff Pomeranz for the position here in Cedar Rapids. He’s been lauded by the Council and others for the prosperity and growth West Des Moines has experienced for the past several years. Others have raised the important point that, unlike Cedar Rapids, West Des Moines is a suburb that benefits from the larger city and metro of Des Moines, but does not share the same burden of problems associated with the dominant center city.

There have also been grumbles about the method of choosing Pomeranz, which was done mostly out of public sight. I have have no real objections, but think he would’ve been better received by the public if the process had been more transparent. That said, I’m happy the city was able to fill the position with a qualified individual so quickly and look forward to see what he can do. A balance between good public relations, working well with the Council, and professional leadership and management skills will be critical for the success of any city manager.

Fate of the Smokestack
The historic 171 foot tall Sinclair smokestack will no longer be saved. An analysis of the structure concluded over half of if would need to be taken down by hand, brick by brick, to stabilize it before reconstructing and restoring it. This not only increased cost estimates for the restoration work, but also would risk losing FEMA funding for demolition of the Sinclair industrial site because work would need to be halted at this point until the stack is stabilized. The City Council voted to let the smokestack go and will likely be taken down sometime next week as demolition work continues. It is inevitably time for this piece of Cedar Rapids history to come down. While disappointing, I’m glad an effort was at least made to see if it could be reasonably preserved.

TrueNorth + Library
The biggest news this week in downtown redevelopment was the city’s decision to sell the flood-damaged library to TrueNorth to redevelop for their own use. TrueNorth is vacating its current building at 4th Avenue and 5th Street SE, for construction of a new central library. This stirs suspicion among many citizen skeptics that this was a back-room deal between city leaders and TrueNorth. TrueNorth is selling their property to the city for $7.5 million and offered to pay $250,000 for the old library, in addition to a $10,000 per month lease fee to the city for up to 15 months to stay in its current building while the library is being renovated for the company.

Two other offers were submitted to the city. Intermec (by way of a separate buyer) offered $350,000 for the library, with plans to relocate from their current building across the street. A third offer from Jody Keener of J.K. Properties LLC proposed turning the old library into a toy museum and retail outlet. (I don’t think anyone saw that one coming)

The city calculated the financial tax impact each proposal would have on the city over ten years and determined TrueNorth would provide the most at $1.26 million, Intermec $924,000, and the toy museum, unsurprisingly, only $84,000 (assuming it lasted that long). Additionally TrueNorth said it will invest a minimum of $7.5 million in the building and retain 120 jobs and create 50 new jobs in the future. The Dummermuth family, which intended to purchased and lease the library to Intermec, planned to reinvest $3.8 million in the building and an additional $2.2 million in furniture and equipment. Intermec would retain 252 high-paying jobs downtown.

Now that the decision is made, design and construction work can commence to renovate the former library into an office building to fit the needs of TrueNorth. We will likely see much of the ground floor converted to parking and the second level expanded across the entire building footprint. TrueNorth evidently has suggested they might also have room in the old library for Intermec. To accommodate both companies, considering the current spaces they each occupy, I imagine the library would need to be expanded even more – perhaps even a third story. This is of course all speculation on my part, but if they work together this could turn out to be a very interesting transformation.

Mexican in NewBo
The owner of Papa Juan’s/Stefano’s in northeast Cedar Rapids wants to open another Mexican restaurant at the former Brosh Funeral Home and Chapel at 10th Ave and 3rd Street SE in New Bohemia, but technicalities about part of the building’s historical status will determine if they can. Without a “contributing” historical status they can not benefit from historic tax credits and would be required to raise the building above the flood level. If it goes their way plans are to invest $900,000 in renovations and be open for business within four months of obtaining permits. The effort seem like a far stretch, but having another restaurant – and occupied building – in that area would be great. Read more here

Army Corps’ Flood Protection Feasibility Study
The results emerging from the Army Corps of Engineers’ feasibility study for a flood protection system along the Cedar River in Cedar Rapids are not looking good. The City and the Corps had a public open house today at the Crowne Plaza to present the current status and process of the study and preliminary alternatives they are coming up with. A flood protection system considered economically feasible by the Army Corps of Engineers would only protect the east bank and involve a permanent flood wall in front of downtown.

This plan stands in stark contrast to the City’s preferred plan which includes an extensive combination of earth levys on the west side and away from downtown, permanent walls by industries, and sections of removable flood walls by downtown, Czech Village, and a few access points along the proposed northwest greenway. Cedar Rapids will most certainly need to compromise on the preferred plan if any system is to ever actually get funded and built, but if the Army Corps’ proposed half-protection system is the best we can [maybe] get, it begs the question if it is even worth it. As of now the City is still pushing to get the funding for the comprehensive flood protection system that will maintain a connection between downtown and the river, and provide protection for the west side as well. More information about the system and the city’s preferred plan can be found here. Also check out another post about the flood protection system at Urban Corridor.

Letter: TrueNorth Site Best for New Library

Below is a letter that my friend Spencer Barnes and I wrote to Cedar Raids Mayor Ron Corbett, City Council members and the Cedar Rapids Public Library Board of Trustees. The Library Board will make a final site recommendation tomorrow at their 4 pm meeting and the City Council is expected to vote on Feb. 24.

To the City Council of Cedar Rapids:

The new library is arguably the most important city facility to be rebuilt from the flood. It is not only a place to store books and information, but it is a place of community engagement, interaction and participation. The new library will have a profound effect on its surrounding area, therefore site selection should not be taken lightly. We feel the issue of parking has been unreasonably prioritized above other equally, if not more important criteria. Furthermore, we have concern with the way parking availability has been defined at certain sites, in particular at TrueNorth.

The alleged problem with providing parking at TrueNorth is hard to accept, with two large city parking garages so close by. Further, the library board’s demand for 315 free parking spaces is also unreasonably excessive. Even Library Director Bob Pasicznuk said that 200 is plenty for our peer libraries, and Des Moines’ new downtown library, for example, only includes 30 spaces.

By asserting such an extreme and unnecessary parking requirement, this ultimately becomes the main determining factor for site selection. If the city is serious about actually being “vibrant” and “urban”, we must strive for the types of places that are accessible and stimulating – that bring together people from all walks of life for all kinds of activities. Alternative means of getting around need to be recognized and encouraged – biking, walking, and transit. Incentivizing private cars is counterproductive to this goal and is unfair to those who cannot drive. Additionally, as the old library was once labeled as downtown’s biggest attraction, maximization of synergistic benefits needs to be prioritized. The library should be placed in a location by which visitors can easily utilize other downtown services including local businesses struggling to gain a foothold after the devastating flood.

Therefore, we believe that TrueNorth is the perfect location to foster community engagement and continued rejuvenation of downtown. A new library at the TrueNorth site could reactivate the fading Green Square Park, creating a truly cultural community green space – bordered by the art museum, former Carnegie Library, and the First Presbyterian Church. With proximity to the established downtown core, yet on the edge of more sparsely built up blocks, the new library here would promote further urban development in this area. The site is also responsibly far from the river, taking on very little water during the flood, so slightly elevating a new library here could mitigate any risk.

We ask that you take a more balanced approach in choosing a final library site and consider which site has the greatest potential to foster a real vibrant and urban hometown. We believe that site is TrueNorth.

Thank you,

Brady Dorman
Senior in Architecture
Iowa State University

Spencer Barnes
Senior in Finance
George Washington University

CR Library picks new director from Castle Rock, CO

The Cedar Rapids library board has chosen Robert Pasicznyuk for the director position of the Cedar Rapids Public Library. Pasicznyuk is currently the associate director at Douglas County Libraries in Castle Rock, CO. His expertise and experience will be instrumental in the rebuilding and recovery of the Cedar Rapids library. According to the Gazette, “At Douglas County Libraries, Pasicznyuk spearheaded a transition to self-service checkout stations and automated returns, which helped the library keep pace during tremendous growth. Activity there has nearly doubled in the past four years, and circulation now runs around 8 million items per year.”

Douglas County LibrariesCastle Rock happens to be where my brother and his family now reside so I have actually been to Douglas County’s Philip S. Miller Library location in Castle Rock. Interesting it is actually in a retrofitted former grocery store. This is noteworthy since some in the community have argued for relocating the library and other city facilities into former big box stores (such as Econofoods, Big Lots) or in Westdale Mall. The Castle Rock facility was done very well and besides the low-rise profile, it is hard to tell it was once a store. However the difference between these two CR’s, is that the Castle Rock library is located right next to the town’s traditional downtown, whereas none of the locations suggested in Cedar Rapids are anywhere near walkable or centralized. Also the urban layouts of the once, small mountain town and the industrial midwestern city of Cedar Rapids, are fundamentally different. Pasicznyuk is certainly smart enough to understand this and I look forward to his direction of the library’s future recovery and expansion.

CR Bridge Library Opens

The Cedar Rapids Public Library’s “Bridge” facility at Westdale Mall opened today, providing a larger, temporary location for the downtown main branch damaged in the flood.  The Bridge is located in the old Osco Drug space and replaces an existing branch location on the upper level of Westdale.  Until now, that was the library’s only location since June.  Project design was donated by OPN Architects.

> The Bridge
> Cedar Rapids Public Library

© 2022 URBAN THINKING

Theme by Anders NorenUp ↑